Rating: 2.7/5 (16 votes)
Mae Mao Hydroelectric Dam
Operating day: Daily
Operating time: 08.00 - 17.00
Mae Mao Hydroelectric Dam Construction concrete dam length of 200 m. 60 m high and a horseshoe-shaped tunnel with a diameter of 5 m and a length of 100 m. Drilling through quasarsite rocks. The surrounding area has beautiful.
Category: Nature and Wildlife
Group: Dam, Reservoir, Lake
Last Update : 3 YearAgo